
Installed capacity
§ 01 — Overview
Rooftop generation, 6.4 MWh of storage and a demand-response layer across nine buildings — cutting peak grid draw by more than a third.
Generation, storage and dispatch are modelled as one system before anything is built, then tuned against live demand once the site is operating. Replace this paragraph with the project narrative.
§ 02 — Specification
14.2 MW
Commercial
Copenhagen
2024
Operating