
Installed capacity
§ 01 — Overview
A frequency-response asset sitting directly on the transmission network, dispatching in under 200 milliseconds to hold the regional grid stable.
Generation, storage and dispatch are modelled as one system before anything is built, then tuned against live demand once the site is operating. Replace this paragraph with the project narrative.
§ 02 — Specification
220 MWh
Infrastructure
Stockholm
2023
Operating